0.6 / Operational Rhythm

Continuity.

Visible persistence of research and field operations. This log provides a structured trace of ongoing work development, spatial diagnostics, and visual theory production.

2026.04
Research Development

Finalizing visual theory boards for GTS Study 03: Sensorimotor Habitat Recomposition.

2026.03
Spatial Diagnostics

Completed spatial reading of a high-density research facility; identified circulation conflicts.

2026.02
Visual Theory Boards

Production of classified institutional research plates for the 'Reachable Difference' framework.

2026.01
Gravity Transition Studies

Internal update to the GTS-01 framework to include orbital re-synchronization cues.

2025.12
Brand Infrastructure

Review of Plato Design institutional value-language and internal positioning.